• Login
Upgrade
dcnmaharashtra.news
  • Home
  • Maharashtra
  • National
  • Pune
  • Crime
  • Education
  • Lifestyle
  • Health
  • Sports
No Result
View All Result
  • Home
  • Maharashtra
  • National
  • Pune
  • Crime
  • Education
  • Lifestyle
  • Health
  • Sports
No Result
View All Result
dcnmaharashtra.news
No Result
View All Result
  • Home
  • Maharashtra
  • National
  • Crime
  • Business
  • Entertainment
  • Health
  • Pune
Home National

Indian Railways’ Preparations for Maha Kumbh 2025

Desk_dcn by Desk_dcn
January 12, 2025
in National
0
Indian Railways’ Preparations for Maha Kumbh 2025
215
SHARES
106
VIEWS
Share on FacebookShare on Twitter

Special Correspondent

Pune : Union Minister of Railways, Shri Ashwini Vaishnaw, has inaugurated several key initiatives to enhance Indian Railways’ readiness for Maha Kumbh 2025 in the Prayagraj region. These measures aim to provide safe, seamless, and technologically advanced services for millions of pilgrims.

Key Announcements and Inaugurations:

1. Launch of the Kumbh War Room:
• A dedicated War Room at the Railway Board level has been inaugurated.
• The War Room will operate 24×7, with officials from Operations, Commercial, RPF, Mechanical, Engineering, and Electrical departments monitoring and coordinating activities.
• 1,176 CCTV cameras installed at 9 stations in the Prayagraj region will provide live feeds for real-time monitoring.
• Monitoring structure:
• Platform → Station → Divisional → District → Zonal → Railway Board.
• The War Room will facilitate effective coordination between district authorities and railway officials, ensuring immediate assistance and operational efficiency.
2. Multilingual Communication Systems:
• 12-language announcement system inaugurated at Prayagraj, Naini, Cheoki, and Subedarganj stations to assist pilgrims.
• Launch of a facilitation booklet in 22 languages, providing essential information for pilgrims.

Passenger Amenities in Prayagraj Region:

1. Rail Network Enhancements:
• A total of 13,000 trains will operate during the Kumbh period:
• 10,000 regular trains.
• 3,134 special trains (4.5 times more than the previous Kumbh):
• 1,869 short-distance trains.
• 706 long-distance trains.
• 559 ring trains.
• Freight trains have been diverted to Dedicated Freight Corridors (DFC) to ensure smooth passenger train operations.
• An investment of ₹5,000 crore has been made over the past three years for Kumbh-related projects.
2. Expanded Passenger Facilities:
• 48 platforms and 21 Foot Over Bridges (FoBs).
• 23 permanent holding areas with a combined capacity of over 1 lakh pilgrims.
• 554 ticketing counters, including 151 mobile UTS counters.
• 21 ROBs/RUBs to enhance road and rail mobility.
• 12-language announcement systems implemented across all 9 key stations.
3. Major Infrastructure Projects:
• Infrastructure development worth ₹3,700 crore includes:
• Banaras-Prayagraj doubling project (including the Ganga Bridge).
• Phaphamau-Janghai doubling project.

Pilgrim Numbers and Preparations:

• 40 crore pilgrims are expected to visit during Maha Kumbh 2025.
• 5 crore pilgrims are anticipated on Mauni Amavasya alone.
• To manage the crowd:
• 1,176 CCTV cameras for real-time monitoring.
• 23 holding areas with a capacity of over 1 lakh people.
• Special color-coded tickets and barcode-enabled UTS systems have been introduced for smoother operations.

These initiatives aim to ensure a safe, efficient, and technology-driven experience for pilgrims during Maha Kumbh 2025, underscoring Indian Railways’ commitment to cultural and infrastructural excellence.

[contact-form][contact-field label=”Name” type=”name” required=”true” /][contact-field label=”Email” type=”email” required=”true” /][contact-field label=”Website” type=”url” /][contact-field label=”Message” type=”textarea” /][/contact-form]

Tags: kumbhmelapunenewsraiwayservicespecialtrains
Previous Post

GMRT to Remain in Current Location as Railway Minister Confirms No Relocation for Pune-Nashik Rail Projec

Next Post

The Deadly Reality of Manjha: A Silent Threat to Humans and Wildlife”

Desk_dcn

Desk_dcn

Related Posts

Tricolor Illuminates Empire State as FIA Honors India-US Milestones
National

Tricolor Illuminates Empire State as FIA Honors India-US Milestones

by admin
August 17, 2026
Government Proposes Mandatory Automotive Cybersecurity and Software Update Rules in India
National

Government Proposes Mandatory Automotive Cybersecurity and Software Update Rules in India

by Desk_dcn
July 3, 2026
Strait of Hormuz Crisis showing oil tankers waiting near the narrow shipping passage
AutoTech

Strait of Hormuz Crisis: Global Energy, Fertilizer and Chip Supply Chains at Risk

by Desk_dcn
March 9, 2026
India T20 World Cup 2026 celebration after defeating New Zealand in the final
Entertainment

India T20 World Cup 2026: Team India Defeat New Zealand to Script Historic Title

by Desk_dcn
March 9, 2026
UPSC CSE Result 2025 merit list showing topper Anuj Agnihotri and other successful candidates
Education

UPSC CSE Result 2025 Announced; Anuj Agnihotri Tops, Maharashtra Candidates Shine

by Desk_dcn
March 6, 2026
Next Post
The Deadly Reality of Manjha: A Silent Threat to Humans and Wildlife”

The Deadly Reality of Manjha: A Silent Threat to Humans and Wildlife"

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Premium Content

Exposed High-Tension Cables on Ramwadi Pedestrian Path Raise Safety Concerns Pune Metro Faces Criticism

Exposed High-Tension Cables on Ramwadi Pedestrian Path Raise Safety Concerns Pune Metro Faces Criticism

May 15, 2025

Man Arrested for Sending Obscene Messages to Minister Pankaja Munde

May 2, 2025
MumbaiPune Expressway Expansion Delayed as MSRDC Prioritizes Other Projects

MumbaiPune Expressway Expansion Delayed as MSRDC Prioritizes Other Projects

March 28, 2025
Pune Ranked Among India’s Most Traffic-Congested Cities, Plans in Place to Address

Pune Police and PMC Launch “Mission Fifteen” to Ease Traffic Congestion

January 4, 2025
Heavy Pre-Monsoon Showers Disrupt Pune Expose Infrastructure Gaps

Heavy Pre-Monsoon Showers Disrupt Pune Expose Infrastructure Gaps

May 14, 2025
Pune-Mumbai Expressway Toll Rates Fixed Until 2030: MSRDC Assures Commuters

Pune-Mumbai Expressway Toll Rates Fixed Until 2030: MSRDC Assures Commuters

March 20, 2025
Tragic Accident on Chakan-Ambethan RoadTwo Teenage Boys Killed After Being Dragged by Speeding Container

Tragic Accident on Chakan-Ambethan RoadTwo Teenage Boys Killed After Being Dragged by Speeding Container

May 31, 2025
Serious Question Mark Over Rs 5 Crore Cash Seized at Khed Shivapur Toll Booth During Elections

Serious Question Mark Over Rs 5 Crore Cash Seized at Khed Shivapur Toll Booth During Elections

January 24, 2025
Case Registered Against Operators of Dhruv Tara Study Center After Fire Destroys Students Materials

Case Registered Against Operators of Dhruv Tara Study Center After Fire Destroys Students Materials

April 3, 2025

© 2025

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Maharashtra
  • National
  • Pune
  • Crime
  • Education
  • Lifestyle
  • Health
  • Sports

© 2025